Sulina Port – quay modernization

Quay on Sulina channel : 400 m Quay on maritime basin: 400 m oncrete platform adjacent to the quays: 28.800 m2 Acces road to the street network of Sulina: 650 m Dredging of the acces area for the quays https://consitrans.ro/wp-content/uploads/2021/07/Modernizare-Cheu-Sulina-25-06-2021.mp4 Sulina Port – quay modernization This feasibility study proposed and integrated modernization of the port…

A7 Highway – Ploiesti – Buzau

Highway Length: 63.25 km Overpasses: 40 Junctions: 6 Maintenance centers: 2 Parking-service spaces: 4 Status: Feasibility Study – finished Technical Project – in work https://consitrans.ro/wp-content/uploads/2021/03/consitrans-buzau-ploiesti.mp4 A7 Highway – Ploiesti – Buzau For this project we provided the analysis for the best highway positioning and layout, followed by the Feasibility Study and Technical project. Part of…